Jobs handled and current projects
Within a short while, the company has executed various projects with commendations from clients and gained vast experience, Project execution is coordinated from the company’s operational base in Port Harcourt.
S/N |
JOB DESCRIPTION |
CLIENT |
1 |
RISK ASSESSMENT OF AGBANI FLOATING PRODUCTION FACILITY (FPF), WATER INJECTION AND OIL PRODUCTION PLATFORMS IN OML 114 |
MONI PULO LIMITED |
2 |
ENVIRONMENTAL PROTECTION AWARENESS SEMINAR FOR HOST COMMUNITIES FOR THE ENTRY OF SAIPEM RIG “AMARA 58” INTO CHEVRON OML 53 AREA IN IMO STATE |
IMO STATE ENVIRONMENTAL PROTECTION AGENCY (ISEPA) |
3 |
PACKAGING OF RIG SITE WASTE MANAGEMENT GUIDELINES FOR ISEPA TO MONITOR RIG SITE WASTE HANDLING FACILITIES AT CHEVRON OML 53 IN IMO STATE. |
IMO STATE ENVIRONMENTAL PROTECTION AGENCY (ISEPA) |
4 |
NOISE LEVEL MEASUREMENT AND MAPPING OF MONI PULO AGBANI FLOATING PRODUCTION FACILITY IN OML 114 CALABAR RIVER ESTUARY |
MONI PULO LIMITED |
5 |
SAFETY COVERAGE FOR FACILITY SHUTDOWN FOR STRUCTURAL MODIFICATION OF BOAT CRADLE ON ABANA EAST PLATFORM IN OML, 114 |
MONI PULO LIMITED |
6 |
INSTALLATION OF HEALTH SAFETY AND ENVIRONMENTAL (HSE) MANAGEMENT SYSTEM FOR EXPO NIGERIA LIMITED. ON AGBANI FPF. |
MONI PULO LIMITED |
7 |
HAZOP ASSESSMENT OF ENGINEERING DESIGN OF NEW GAS INJECTION/GAS LIFT SYSTEM FOR OFFSHORE PRODUCTION FACILITY |
AMNI INTERNATIONAL PETROLEUM DEVELOPMENT COMPANY LIMITED |
8 |
SAFETY ACTIVITIES FOR FACILITY SHUTDOWN FOR TESTING AND REPLACEMENT OF RELIEF VALUES. |
MONI PULO LIMITED |
9 |
HAZOP FOR THE MODIFICATION OF WATER INJECTION PLATFORM BOAT-LANDINGG AT OML |
MONI PULO LIMITED |
10 |
CLOSING OUTSTANDING SAFETY AUDIT OF AGBANI FPF OPL 230 |
MONI PULO LIMITED |
11 |
HAZOP AND SAFETY ACTIVITIES FOR POST-DRILLING COMMISSIONING OF ABANA EAST NEW WELLS A4 & A6 |
MONI PULO LIMITED |
12 |
SAFETY ACTIVITIES FOR CRANE MAINTENANCE AND PRODUCTION LOGGING TOOL JOB ON ABANA EAST WELLS IN OML 114 |
MONI PULO LIMITED |
13 |
INVENTORY OF OML 230/AGBANI FPF SAFETY SYSTEM FOR ANNUAL HSE PERFORMANCE EVALUATION/AUDITING |
MONI PULO LIMITED |
14 |
JOINT HSE AUDIT OF AGBANI FPF/OML 114 BY BRITISH SAFEY COUNCIL HSE CONSULTANT |
MONI PULO LIMITED |
15 |
VESSEL ENTRY, CLEANING AND WASTE DISPOSAL OF 1ST STAGE, 2ND STAGE AND TEST SEPARATORS ON AGBANI FPF AT OML 114 |
MONI PULO LIMITED |
16 |
HSE TRAINING ON ENVIRONMENTAL COMPLIANCE FUNDAMENTALS FOR OIL PRODUCTION PERSONNEL |
MONI PULO LIMITED |
17 |
TRAINING ON HSE ASPECTS OF DRILLING OPERATIONS FOR CHEVRON/TEXACO PERSONNEL ON BEHALF OF SIGMA OIL & GAS CONSULT |
MONI PULO LIMITED |
18 |
CRANE OPERATORS TRAINING FOR PROSAFE PRODUCTION OPERATORS ON ADDAX OPL 98 FIELD |
PROSAFE NIGERIA LIMITED |
19 |
HSE TRAINING ON THE USE OF EMERGENCY AIR SUPPORT (EAS) SYSTEM (AIR POCKETS) IN DITCHING HELICOPTERS FOR NOBLE DON WALKER RIG PERSONNEL |
MONI PULO LIMITED |
20 |
PACKAGING & PRESENTATION OF 2003 WORK PROGRAM FOR OIL PRODUCTION OPERATIONS FOR OML 114 TO DEPARTMENT OF PETROLEUM RESOURCES LAGOS. |
MONI PULO LIMITED |
21 |
GENERAL HSE ASSESSMENT AND PROVIDED SAFETY SERVICES FOR COILED TUBING/SAND CLEAN OUT JOBS BY BJ SERVICES & HALLIBURTON ON WELLS A6 & A8 AT OML 114 |
MONI PULO LIMITED |
22 |
PRE-MOB EQUIPMENT INSPECTION AND JOB SITE HAZARD ANALYSIS OF PRESSURE FOR THE FLUSHING OF SPDC 4.8KM FLOW LINE WITH PRESSURE PUMPS/EQUIPMENT |
COCACC RESOURCES LTD. |
23 |
JOINT FIVE STAR HSE AUDIT OF OML 114 WITH BRITISH SAFETY AUDITOR TO EARN MONI PULO LTD. 4 STAR AWARD. |
MONI PULO LIMITED |
24 |
ESTABLISHMENT OF QUALITY MANAGEMENT SYSTEMS AND ISO 9001:2000 ACCREDITATION FOR FIDEPAT INTERNATIONAL LTD. P.H |
FIDEPAT INTERNATIONAL LTD |